Construction site operations – assembling, lifting and moving

Project description

Case Study 24

INITIAL SITUATION: Daily work on many construction sites, no matter which type: heavy loads such as concrete slabs or façade elements which must be fitted in, must be moved and often placed exactly. This must not happen on even industrial floor but directly on site, often outside on rough ground. On one day on the ground floor or outside, on another day on one of the higher floors – the aluminium gantry crane can be used very flexibly.

SOLUTION: The mobile SCHILLING Aluminium Gantry Cranes are the optimal solution for this kind of task. Even for difficult lifting requirements with very limited space and uneven ground areas they perfectly complete or even replace larger cranes. Why? Because of the aluminium construction, they are light and can perfectly be moved from one place to another, assembled with a few steps and ready for use immediately.

RESULT: As a result, SCHILLING Aluminium Gantry Cranes are the invaluable assistant for a wide range of lifting tasks on a construction site – wherever heavy loads need to be moved, the characteristics of our innovative devices are an invaluable advantage.

 

Are you interested in our product range or would you like to become a SCHILLING sales partner? Contact us here!